Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe subgrade preparation for the building pads on Lots #1 thru #5 and approved compacting efforts by proof-rolling subgrade soils using a loaded off road dump making two passes over all areas. The subgrade soils appeared stable under traffic and suitable for job plans and specifications requirements. The contractor also graded out the cul-de-sac for curb installation.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Proof rolling of sub grades at bldg. pads 1 thru 5






Sub grade prep. at cul de sac for curbing