Daily Field Report

Date :11/11/2025
Project No :2025C214
Client Company :Artisan
Arrival Time :11/11/2025
Onsite Hours :
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :sunny
Departure Time :11/11/2025
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

Upon arrival on site, a Komatsu 39PXI dozer was observed walking in the slopes, while a Hamm ride-on vibratory roller was compacting the previous day’s lift.

The foreman reported that the Seven Hills amenities area had run out of borrow, and therefore, no additional soil import or placement would be performed today.

Compacting

Walking in slopes

Technician Signature / DateRussell Hendrix, November 11, 2025
Reviewer Name / DateKenneth Mosman, November 16, 2025