- Home
- Density Test Report Report ID: 87827
- Edit Download Report
Density Test Report
Date :11/13/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :11/13/2025 07:30
Onsite Hours :08:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :11/13/2025 15:30
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/13/2025 | 1 | 20.7 | 95.8 | FP 2 | 100.0 | 18.5 | 95.8 | 95 | D6938 | Pass |
| Location : | Lot #3 and #4 area, Elv/Depth :1504 | |||||||||
| Comment : | Field Proctor #3 : 100.5 pcf @ 20.5% optimum moisture | Gauge Serial No. :77-19952 | ||||||||
| 11/13/2025 | 2 | 17.3 | 97.4 | FP 2 | 100.0 | 18.5 | 97.4 | 95 | D6938 | Pass |
| Location : | Roadway in front of Lots #3 and #4, Elv/Depth :1504 | |||||||||
| Comment : | Field Proctor #3 : 100.5 pcf @ 20.5% optimum moisture | Gauge Serial No. :77-19952 | ||||||||
| 11/13/2025 | 3 | 27.0 | 91.5 | FP 2 | 100.0 | 18.5 | 91.5 | 95 | D6938 | Fail |
| Location : | Lot #1 roadway, Elv/Depth :1506 | |||||||||
| Comment : | Field Proctor #3 : 100.5 pcf @ 20.5% optimum moisture. Recompaction required. Contractor informed. | Gauge Serial No. :77-19952 | ||||||||
| 11/13/2025 | 4 (retest of Test #3) | 21.8 | 97.5 | FP 2 | 100.0 | 18.5 | 97.5 | 95 | D6938 | Pass |
| Location : | Lot #1 roadway, Elv/Depth :1506 | |||||||||
| Comment : | Field Proctor #3 : 100.5 pcf @ 20.5% optimum moisture | Gauge Serial No. :77-19952 | ||||||||
Technician Signature / DateSean Willett, November 13, 2025
Reviewer Name / DateKenneth Mosman, November 16, 2025