Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
The crew continued working at SD3-A, installing the drainage access as per the plan in the north direction and leveling the area. They also placed riprap at four locations.
At SD3-B, the crew installed the drainage access in the northeast direction, leveled the area, and placed three riprap sections as per the plan.
Stockpiled soil was then placed between Buildings #15 through #19 in two lifts, and each lift was compacted.
Meanwhile, the erosion-control crew continued installing straw erosion control blankets along the SD3-A pond slopes.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.