Skip to content

Daily Field Report

Date :12/01/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :12/01/2025 07:30
Onsite Hours :05:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :12/01/2025 13:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the
purpose of providing quality control inspection and testing services. Visual observation techniques were
employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site as requested by the contractor (NG Grading) for the
observation/testing of the placement of fill/backfill. Upon arrival to the site, the surface appeared to be saturated from the rainfall over the previous weekend. The contractor stripped approx. 6in to 1ft off of the lots #8 – #13 and #52 – #60 area. Then the contractor rolled this area with a sheep’s foot roller and began to place fill in approximately 6in to 8in lifts. ASEC moisture checked the fill via dry back method and moisture content was with in optimum range. Density testing was conducted, and test results were provided to the contractor. ASEC watched as loaded off road trucks rolled across the lifts to check for stability. There were no signs of pumping or cracking present, and the lifts appear to be stable.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding
this report, please feel free to contact us. We will be more than happy to discuss it with you.

8 - 13 and 52 - 60 area

cut from above 8 - 13 and 52 - 60 area

commercial lot area

commercial lot area

front detention pond

8 - 13 and 52 - 60 area

Technician Signature / DateSean Willett, December 1, 2025