Skip to content

Density Test Report

Date :12/23/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :12/23/2025 11:00
Onsite Hours :04:00
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :Sunny
Departure Time :12/23/2025 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/23/2025 1 19.7 92.3 2025-032 SP 94.9 25.0 97.3 95 D6938 Pass
Location : Pipeline 11 to 12, Elv/Depth :4 to 5 feet over pipe
Comment : some blasted rock present in fill Gauge Serial No. :77-19952
12/23/2025 2 10.0 97.2 2025-032 SP 94.9 25.0 102.4 95 D6938 Pass
Location : Pipeline 11 to 12, Elv/Depth :4 to 5 feet over pipe
Comment : blasted rock present in fill Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, December 23, 2025
Reviewer Name / DateKenneth Mosman, February 02, 2026