Density Test Report

Date :01/14/2026
Project No :2025C260
Client Company :Artisan
Arrival Time :01/14/2026 09:00
Onsite Hours :07:00
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :cloudy
Departure Time :01/14/2026 16:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/14/2026 1 18.6 98.6 2025-031 SP 101.0 20.7 97.6 95 D6938 Pass
Location : Building Lot #41, Elv/Depth :11 feet below finished grade
Comment : Gauge Serial No. :91643
01/14/2026 2 18.4 97.9 2025-031 SP 101.0 20.7 96.9 95 D6938 Pass
Location : Building Lot #40, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
01/14/2026 3 13.8 101.5 2025-033 SP 104.0 16.2 97.6 95 D6938 Pass
Location : Building Lot #38, Elv/Depth :11 feet below finished grade
Comment : Gauge Serial No. :91643
01/14/2026 4 13.7 100.6 2025-033 SP 104.0 16.2 96.7 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 14, 2026
Reviewer Name / DateKenneth Mosman, February 02, 2026