Density Test Report

Date :01/17/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/17/2026 08:30
Onsite Hours :08:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :cloudy
Departure Time :01/17/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/17/2026 1 12.4 105.7 2025-035 SP 107.8 13.0 98.1 95 D6938 Pass
Location : 30" RCP storm between D9 and D10, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
01/17/2026 2 12.7 103.7 2025-035 SP 107.8 13.0 96.2 95 D6938 Pass
Location : 30" RCP storm between D9 and D10, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
01/17/2026 3 11.2 104.2 2025-035 SP 107.8 13.0 96.7 95 D6938 Pass
Location : 30" RCP storm between D9 and D10, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
01/17/2026 4 12.2 104.9 2025-035 SP 107.8 13.0 97.3 95 D6938 Pass
Location : 30" RCP storm between D9 and D10, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 17, 2026
Reviewer Name / DateKenneth Mosman, February 04, 2026