Density Test Report

Date :01/20/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/20/2026 08:30
Onsite Hours :07:30
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/20/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/20/2026 1 29.6 70.8 2025-057 92.1 25.7 76.9 95 D2937 Fail
Location : Between points F2-F3, Elv/Depth :4 feet below finished grade
Comment : Soil is above optimum moisture content and does not meet specified compaction requirements. Area requires aerating and re-compaction.
01/20/2026 2 28.9 72.2 2025-057 92.1 25.7 78.4 95 D2937 Fail
Location : Between F2-F3, Elv/Depth :3 feet below finished grade
Comment : Material is excessively wet and failed to achieve the specified compaction.
Technician Signature / DateSamara Simha Reddy Kandi, January 20, 2026
Reviewer Name / DateKenneth Mosman, February 09, 2026