Skip to content

Density Test Report

Date :01/23/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :01/23/2026 08:30
Onsite Hours :02:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :01/23/2026 11:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/23/2026 1 19.2 88.4 FP 2 100.0 18.5 88.4 95 D6938 Fail
Location : Lot #51, Elv/Depth :1511
Comment : pumping was present on the lift, and it is raining at the time on installation. contractor is stopping structural fill. Gauge Serial No. :38069
01/23/2026 2 19.7 106.8 2025-055 107.3 15.5 99.5 95 D6938 Pass
Location : Lot #52, Elv/Depth :2 feet below finished grade
Comment : mixture of micatious weathered rock in this lift Gauge Serial No. :38069
Technician Signature / DateSean Willett, January 23, 2026
Reviewer Name / DateKenneth Mosman, February 09, 2026