Skip to content

Density Test Report

Date :01/16/2026
Project No :2025C244
Client Company :McCallan Group
Arrival Time :01/16/2026 8:00
Onsite Hours :07:00
Name of the Project :Cassville Rd tract, proposed Burrito Wrap
Project Location :Cartersville
Weather :cold
Departure Time :01/16/2026 15:00
ASEC Technician Name :Mahendra Mylabathula

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/16/2026 1 24.5 90.9 2025-050 103.5 21.4 87.8 95 D2937 Fail
Location : Lot #42, Elv/Depth :3 feet below finished grade
Comment : Recommended scarify, aerate to reduce in-situ moisture contents then recompact.
01/16/2026 2 23.2 95.1 2025-050 103.5 21.4 91.9 95 D2937 Fail
Location : Lot #43, Elv/Depth :3 feet below finished grade
Comment : Recompaction required
Technician Signature / DateMahendra Mylabathula, January 16, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026