- Density Test Report Report ID: 89614
- Edit Download Report
Density Test Report
Date :01/28/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/28/2026 09:00
Onsite Hours :08:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :cloudy
Departure Time :01/28/2026 17:00
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/28/2026 | 1 | 13.4 | 103.4 | 2025-035 SP | 107.8 | 13.0 | 95.9 | 95 | D6938 | Pass |
| Location : | Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/28/2026 | 2 | 14.1 | 103.9 | 2025-035 SP | 107.8 | 13.0 | 96.4 | 95 | D6938 | Pass |
| Location : | Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/28/2026 | 3 | 14.7 | 104.1 | 2025-035 SP | 107.8 | 13.0 | 96.6 | 95 | D6938 | Pass |
| Location : | Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/28/2026 | 4 | 12.8 | 105.4 | 2025-035 SP | 107.8 | 13.0 | 97.8 | 95 | D6938 | Pass |
| Location : | Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :2.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/28/2026 | 5 | 13.0 | 105.5 | 2025-035 SP | 107.8 | 13.0 | 97.9 | 95 | D6938 | Pass |
| Location : | Backfill for 18" RCP storm line between D12 and D19, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, January 28, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026