Skip to content

Density Test Report

Date :01/29/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/29/2026 09:00
Onsite Hours :08:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :cloudy
Departure Time :01/29/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/29/2026 1 13.9 100.4 2025-033 SP 104.0 16.2 96.5 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :13.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/29/2026 2 14.4 101.0 2025-033 SP 104.0 16.2 97.1 95 D6938 Pass
Location : Building Lot #36, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :91643
01/29/2026 3 14.7 101.0 2025-033 SP 104.0 16.2 97.1 95 D6938 Pass
Location : Building Lot #35, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91643
01/29/2026 4 15.2 101.0 2025-033 SP 104.0 16.2 97.1 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :11 feet below finished grade
Comment : Gauge Serial No. :91643
01/29/2026 5 14.1 99.8 2025-033 SP 104.0 16.2 96.0 95 D6938 Pass
Location : Building Lot #36, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
01/29/2026 6 14.7 100.7 2025-033 SP 104.0 16.2 96.8 95 D6938 Pass
Location : Building Lot #35, Elv/Depth : 5 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 29, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026