Density Test Report
Date :01/29/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/29/2026 08:30
Onsite Hours :08:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/29/2026 16:30
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/29/2026 | 1 | 29.6 | 70.8 | 2026-010 | 98.1 | 22.4 | 72.2 | 95 | D2937 | Fail |
| Location : | Between point E1- Detention pond 1, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | High moisture content in the soil. | |||||||||
| 01/29/2026 | 2 | 22.8 | 85.0 | 2025-059 | 88.7 | 22.0 | 95.8 | 95 | D2937 | Pass |
| Location : | Between point E1- detention pond 1, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 01/29/2026 | 3 | 22.2 | 86.4 | 2025-059 | 88.7 | 22.0 | 97.4 | 95 | D2937 | Pass |
| Location : | Between point E1- detention pond 1, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSamara Simha Reddy Kandi, January 29, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026