Density Test Report

Date :01/29/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/29/2026 08:30
Onsite Hours :08:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/29/2026 16:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/29/2026 1 29.6 70.8 2026-010 98.1 22.4 72.2 95 D2937 Fail
Location : Between point E1- Detention pond 1, Elv/Depth :4 feet below finished grade
Comment : High moisture content in the soil.
01/29/2026 2 22.8 85.0 2025-059 88.7 22.0 95.8 95 D2937 Pass
Location : Between point E1- detention pond 1, Elv/Depth :4 feet below finished grade
Comment :
01/29/2026 3 22.2 86.4 2025-059 88.7 22.0 97.4 95 D2937 Pass
Location : Between point E1- detention pond 1, Elv/Depth :2 feet below finished grade
Comment :
Technician Signature / DateSamara Simha Reddy Kandi, January 29, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026