Density Test Report
Date :02/10/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/10/2026 14:30
Onsite Hours :03:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :02/10/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/10/2026 | 1 | 26.3 | 91.1 | 2025-032 SP | 94.9 | 25.0 | 96.0 | 95 | D6938 | Pass |
| Location : | Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+2 feet side of pipe | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/10/2026 | 2 | 24.2 | 91.7 | 2025-032 SP | 94.9 | 25.0 | 96.6 | 95 | D6938 | Pass |
| Location : | Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+2 feet side of pipe | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/10/2026 | 3 | 23.7 | 92.5 | 2025-032 SP | 94.9 | 25.0 | 97.5 | 95 | D6938 | Pass |
| Location : | Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/10/2026 | 4 | 26.3 | 93.7 | 2025-032 SP | 94.9 | 25.0 | 98.7 | 95 | D6938 | Pass |
| Location : | Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/10/2026 | 5 | 25.2 | 94.0 | 2025-032 SP | 94.9 | 25.0 | 99.1 | 95 | D6938 | Pass |
| Location : | Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, February 10, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026