Skip to content

Density Test Report

Date :02/03/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :02/02/2026 07:30
Onsite Hours :06:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :02/02/2026 13:30
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/02/2026 1 17.8 92.9 FP 2 100.0 18.5 92.9 95 D6938 Fail
Location : SSMH 1.5 to 3.0 , Elv/Depth :3 to 4 feet over pipeline
Comment : Gauge Serial No. :77-19952
02/02/2026 2 (retest) 23.1 96.1 FP 3 100.5 20.5 95.6 95 D6938 Pass
Location : SSMH 1.5 to 3.0, Elv/Depth :3 to 4 feet over pipeline
Comment : mixture of material in the backfill. red/brown with mica Gauge Serial No. :77-19952
02/02/2026 3 17.7 92.4 FP 2 100.0 18.5 92.4 95 D6938 Fail
Location : SSMH 1.5 to 3.0, Elv/Depth :5 to 6 feet over pipeline
Comment : Gauge Serial No. :77-19952
02/02/2026 4 (retest) 17.8 95.2 FP 2 100.0 18.5 95.2 95 D6938 Pass
Location : SSMH 1.5 to 3.0, Elv/Depth :5 to 6 feet over pipeline
Comment : Gauge Serial No. :77-19952
02/02/2026 5 23.1 96.8 FP 3 100.5 20.5 96.3 95 D6938 Pass
Location : Lots #4 and #5, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :77-19952
02/02/2026 6 18.2 94.2 FP 2 100.0 18.5 94.2 95 D6938 Fail
Location : SSMH 1.5 to 3.0, Elv/Depth :7 to 8 feet over pipeline
Comment : Gauge Serial No. :77-19952
02/02/2026 7 (retest) 15.7 97.3 FP 2 100.0 18.5 97.3 95 D6938 Pass
Location : SSMH 1.5 to 3.0 , Elv/Depth :7 to 8 feet over pipeline
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, February 3, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026