Skip to content

Density Test Report

Date :02/09/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :02/09/2026 07:30
Onsite Hours :08:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :02/09/2026 15:30
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/09/2026 1 13.7 106.5 2025-055 107.3 15.5 99.3 95 D6938 Pass
Location : Retaining wall #2, Elv/Depth :1 basket
Comment : Gauge Serial No. :77-19952
02/09/2026 2 21.7 97.1 FP 2 100.0 18.5 97.1 95 D6938 Pass
Location : Lots #32 through #40 and #85 through #90 area, Elv/Depth :1460
Comment : lots 85 - 92 are mainly cut lots (fill placed in front yards and partially on the pads) and lots 32 - 40 are mainly front yards. The pads will be filled after install of wall #1. Testing is focused mainly in the roadeay inbetween these lots. Gauge Serial No. :77-19952
02/09/2026 3 21.4 98.9 FP 2 100.0 18.5 98.9 95 D6938 Pass
Location : Lots #32 through #40 and #85 through #92 area, Elv/Depth :1460
Comment : Gauge Serial No. :77-19952
02/09/2026 4 23.6 87.6 FP 2 100.0 18.5 87.6 95 D6938 Fail
Location : Lot #5, Elv/Depth :at finished grade
Comment : will retest on a later date Gauge Serial No. :77-19952
02/09/2026 5 26.9 86.7 FP 2 100.0 18.5 86.7 95 D6938 Fail
Location : Lot #4, Elv/Depth :at finished grade
Comment : will retest on a later day, too wet Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, February 9, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026