Density Test Report

Date :02/11/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/11/2026 08:00
Onsite Hours :07:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :cloudy light rain
Departure Time :02/11/2026 15:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/11/2026 1 15.9 96.9 Field proctor #6 98.0 17.2 98.9 95 D6938 Pass
Location : Building Lots #63 thru 65, Elv/Depth :13 to 18 feet below finished grade
Comment : Gauge Serial No. :91643
02/11/2026 2 16.9 97.4 Field proctor #6 98.0 17.2 99.4 95 D6938 Pass
Location : Building Lots #63 thru 65, Elv/Depth :13 to 18 feet below finished grade
Comment : Gauge Serial No. :91643
02/11/2026 3 16.0 95.9 Field proctor #6 98.0 17.2 97.9 95 D6938 Pass
Location : Building Lots #63 thru 65, Elv/Depth :10 to 18 feet below finished grade
Comment : Gauge Serial No. :91643
02/11/2026 4 17.1 95.9 Field proctor #6 98.0 17.2 97.9 95 D6938 Pass
Location : Building Lots #63 thru 65, Elv/Depth :10 to 18 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 11, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026