Skip to content

Density Test Report

Date :02/18/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/18/2026 09:00
Onsite Hours :9:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :cloudy
Departure Time :02/18/2026 18:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/18/2026 1 13.1 102.8 Field proctor #6 98.0 17.2 92.8 95 D6938 Fail
Location : Building Lot #38, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
02/18/2026 2 12.8 89.5 Field proctor #6 98.0 17.2 91.3 95 D6938 Fail
Location : Building Lot #38, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
02/18/2026 3 13.7 90.1 Field proctor #6 98.0 17.2 91.9 95 D6938 Fail
Location : Building Lot #39, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
02/18/2026 4 13.8 90.6 Field proctor #6 98.0 17.2 92.4 95 D6938 Fail
Location : Building Lot #39, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 18, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026