Density Test Report

Date :02/19/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :02/19/2026 08:00
Onsite Hours :08:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :02/19/2026 16:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/19/2026 1 21.9 98.4 2025-023 SP 103.5 18.9 95.1 95 D6938 Pass
Location : Lot #40, Elv/Depth :1029.96
Comment : Gauge Serial No. :91487
02/19/2026 2 22 104.1 2025-023 SP 103.5 18.9 100.6 95 D6938 Pass
Location : Lot #40, Elv/Depth :1028.95
Comment : Gauge Serial No. :91487
02/19/2026 3 16 100.0 2025-023 SP 103.5 18.9 96.6 95 D6938 Pass
Location : Lot #39, Elv/Depth :1020.20
Comment : Gauge Serial No. :91487
02/19/2026 4 18.9 95.2 2025-022 SP 103.7 16.1 91.8 95 D6938 Fail
Location : Lot #39, Elv/Depth :1019.24
Comment : Recompaction required. Gauge Serial No. :91487
02/19/2026 5 18.8 105.8 2025-023 SP 103.5 18.9 102.2 95 D6938 Pass
Location : Lot #39, Elv/Depth :1015.58
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, February 19, 2026
Reviewer Name / DateKenneth Mosman, February 24, 2026