- Home
- Daily Field Report Report ID: 90435
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.
Our ASEC representative was on site to observe the contractor for the observation/testing of the placement of fill/backfill.
Upon arrival to the site, ASEC met with the contractor to discuss site conditions and where the contractor required density testing to be performed. The contractor has partially backfilled SSMH S-1 to SSMH S-2. This pipeline appears to have been backfilled approximately 3 feet over the pipeline and compacted with a vibrating sheep-foot roller. Density testing was performed, and test results were provided to the contractor.
The contractor is actively installing SSMH V-1 to SSMH V-2. It does not appear that the contractor will be backfilling this line today.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.



