- Home
- Concrete Test Report Report ID: 90519
- Edit Download Report
Concrete Test Report
Date :02/12/2026
Project No :2026C115-WO 1
Client Company :WSP
Arrival Time :02/11/2026 22:
Onsite Hours :12:00
Name of the Project :Lanier Islands Parkway
Project Location :Buford
Weather :cold
Departure Time :02/12/2026 10:
ASEC Technician Name :Mahendra Mylabathula
Concrete Placement Information
Location(S):
N/A
Testing:
9 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 9 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 9 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Technician Signature / DateMahendra Mylabathula, February 12, 2026
Reviewer Name / DateKenneth Mosman, February 26, 2026
