Daily Field Report

Date :02/23/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :02/23/2026 08:00
Onsite Hours :9:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :02/23/2026 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Crew resumed earthwork operations between Lots #39 and 40. Fill was placed in uniform lifts, with each lift maintained at an approximate thickness of 6–8 inches. The material was spread and leveled using a crawler bulldozer. After spreading, each lift was compacted using a sheep-foot roller.

Additionally, the crew continued topsoil stripping operations at Lots #49 through 53. Existing topsoil was cut and removed from the designated building pad areas. The stripped topsoil was then transported and utilized in the designated slope areas for final grading.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you

Density test using Nuclear gauge

spreading dirt using crawler dozer

Compacting using sheep foot roller

Density test using Nuclear gauge

Density test using Nuclear gauge

Technician Signature / DateSamara Simha Reddy Kandi, February 23, 2026
Reviewer Name / DateKenneth Mosman, February 26, 2026