- Home
- Daily Field Report Report ID: 90896
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe the grading contractor continue placing fill in the green space slope embankment north of building Lot #66. The contractor also spent time covering rock for the drill rig
The blasting contractor also continued drilling hard rock at Lots #47 and 48.
The pipe contractor also begin excavation begin manholes #10A and B1 to install 8″ DIP sanitary sewer line B.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.