- Daily Field Report Report ID: 91089
- Edit Download Report
Daily Field Report
Date :03/06/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/06/2026 07:30
Onsite Hours :07:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/06/2026 15:00
ASEC Technician Name :Clyde Smith
Observations/Finding
On the above date the writer was onsite as requested and observed the Pipe contractor continue excavating between manhole # B-4 and B-5 to install 8″ pvc sanitary sewer line.Also continued backfilling sanitary sewer line between B-3 and B-5.
The Blast contractor also continued drilling at lots 43 and 42 planning for Blast on 3/9/26.
The Paving contractor also continued placing contract base stone at Nature Walk blvd. between manholes #6 and 9 over recommended repair sub grade areas.








Technician Signature / DateClyde Smith, March 6, 2026