Density Test Report

Date :03/11/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/11/2026 08:00
Onsite Hours :9:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/11/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/11/2026 1 12.9 103.1 2025-035 SP 107.8 13.0 95.6 95 D6938 Pass
Location : Backfill between sanitary sewer manhole #7 and 8, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/11/2026 2 12.2 103.7 2025-035 SP 107.8 13.0 96.2 95 D6938 Pass
Location : Backfill between sanitary sewer manhole #7 and 8, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/11/2026 3 14.2 110.3 Field proctor #6 98.0 17.2 98.6 98 D6938 Pass
Location : Backfill at 8" sanitary sewer line between manhole #7 and 8, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
03/11/2026 4 15.2 97.7 Field proctor #6 98.0 17.2 99.7 98 D6938 Pass
Location : Backfill between sanitary sewer manhole #7 and 8, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateClyde Smith, March 11, 2026
Reviewer Name / DateKenneth Mosman, March 19, 2026