Skip to content

Density Test Report

Date :03/13/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/13/2026 08:00
Onsite Hours :08:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/13/2026 16:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/13/2026 1 15.8 96.9 Field proctor #6 98.0 17.2 98.9 95 D6938 Pass
Location : Backfill at SS trench between B8 and B9, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91643
03/13/2026 2 14.9 110.2 Field proctor #6 98.0 17.2 97.9 95 D6938 Pass
Location : Backfill at SS trench between B8 and B9, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91643
03/13/2026 3 15.1 96.3 Field proctor #6 98.0 17.2 98.3 95 D6938 Pass
Location : Backfill at SS trench between B8 and B9, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, March 13, 2026
Reviewer Name / DateKenneth Mosman, March 19, 2026