- Home
- Density Test Report Report ID: 91423
- Edit Download Report
Density Test Report
Date :03/19/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/19/2026 08:00
Onsite Hours :06:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/19/2026 14:00
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/19/2026 | 1 | 13.4 | 96.6 | Field proctor #6 | 98.0 | 17.2 | 98.6 | 95 | D6938 | Pass |
| Location : | Backfill around manhole #B5, Elv/Depth :4.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 03/19/2026 | 2 | 14.8 | 96.4 | Field proctor #6 | 98.0 | 17.2 | 98.4 | 98 | D6938 | Pass |
| Location : | Backfill around manhole # B5, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, March 19, 2026
Reviewer Name / DateKenneth Mosman, March 24, 2026