Skip to content

Daily Field Report

Date :03/28/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :03/28/2026 07:00
Onsite Hours :01:00
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :Sunny
Departure Time :03/28/2026 08:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site to observe the contractor (Lewis Contracting) and for the observation/testing of the placement of fill/backfill.

A site inspection was performed. A grab sample of the backfill material stockpiled on site was taken back to the lab to perform a moisture-density relationship (proctor). This sample contains soils mixed with GAB for the purposes of drying out the soil to a near optimum moisture content. It appears the contractor has placed approximately 2 feet of soil over the sewer line. ASEC will be back on the next available workday to perform density testing with the new proctor information.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

stockpile

GAB

sewer line

sewer line

stockpile

Technician Signature / DateSean Willett, March 28, 2026
Reviewer Name / DateKenneth Mosman, March 31, 2026