Skip to content

Density Test Report

Date :03/26/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/26/2026 08:00
Onsite Hours :06:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/26/2026 14:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/26/2026 1 16.2 99.2 2025-023 SP 103.5 18.9 95.8 95 D6938 Pass
Location : Lot #49, Elv/Depth :1050
Comment : Gauge Serial No. :91487
03/26/2026 2 15.2 106.5 2025-023 SP 103.5 18.9 102.9 95 D6938 Pass
Location : Lot #50, Elv/Depth :1054
Comment : Gauge Serial No. :91487
03/26/2026 3 14.1 107.5 2025-023 SP 103.5 18.9 103.9 95 D6938 Pass
Location : Lot #51, Elv/Depth :1055
Comment : Gauge Serial No. :91487
03/26/2026 4 20 103.6 2025-023 SP 103.5 18.9 100.1 95 D6938 Pass
Location : Lot #52, Elv/Depth :1056
Comment : Gauge Serial No. :91487
03/26/2026 5 21 99.3 2025-023 SP 103.5 18.9 95.9 95 D6938 Pass
Location : Lot #53, Elv/Depth :1057
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 26, 2026
Reviewer Name / DateKenneth Mosman, April 02, 2026