Skip to content

Density Test Report

Date :03/26/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :03/26/2026 14:00
Onsite Hours :02:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :03/26/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/26/2026 1 18.5 94.1 2025-032 SP 94.9 25.0 99.2 95 D6938 Pass
Location : Lot #41, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :91487
03/26/2026 2 18.4 92.7 2025-032 SP 94.9 25.0 97.7 95 D6938 Pass
Location : Lot #41, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :91487
03/26/2026 3 18.7 92.0 2025-032 SP 94.9 25.0 96.9 95 D6938 Pass
Location : Lot #42, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91487
03/26/2026 4 25.7 92.8 2025-032 SP 94.9 25.0 97.8 95 D6938 Pass
Location : Lot #42, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 26, 2026
Reviewer Name / DateKenneth Mosman, April 02, 2026