Skip to content

Density Test Report

Date :03/30/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/30/2026 06:00
Onsite Hours :12:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/30/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/30/2026 1 18.1 102.8 2025-023 SP 103.5 18.9 99.3 95 D6938 Pass
Location : Lot #20, Elv/Depth :1047
Comment : Gauge Serial No. :91487
03/30/2026 2 20.8 100.5 2025-023 SP 103.5 18.9 97.1 95 D6938 Pass
Location : Lot #20, Elv/Depth :1047
Comment : Gauge Serial No. :91487
03/30/2026 3 21.3 98.6 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #21, Elv/Depth :1041
Comment : Gauge Serial No. :91487
03/30/2026 4 20.2 98.7 2025-023 SP 103.5 18.9 95.4 95 D6938 Pass
Location : Lot #21, Elv/Depth :1039
Comment : Gauge Serial No. :91487
03/30/2026 5 20.5 118.8 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #22, Elv/Depth :1034
Comment : Gauge Serial No. :91487
03/30/2026 6 17.9 103.4 2025-023 SP 103.5 18.9 99.9 95 D6938 Pass
Location : Lot #22, Elv/Depth :1031
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 30, 2026