Density Test Report

Date :03/31/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :03/31/2026 08:00
Onsite Hours :05:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :03/31/2026 13:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/31/2026 1 23.3 100.3 2025-031 SP 101.0 20.7 99.3 95 D6938 Pass
Location : Lot #39, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91487
03/31/2026 2 24.2 99.0 2025-031 SP 101.0 20.7 98.0 95 D6938 Pass
Location : Lot #39, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91487
03/31/2026 3 23.4 118.8 2025-031 SP 101.0 20.7 95.3 95 D6938 Pass
Location : Lot #38, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 31, 2026
Reviewer Name / DateKenneth Mosman, April 02, 2026