Density Test Report

Date :04/02/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/02/2026 08:00
Onsite Hours :06:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/02/2026 14:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/02/2026 1 20.5 118.9 2025-023 SP 103.5 18.9 95.4 95 D6938 Pass
Location : Lot #22, Elv/Depth :1034
Comment : Gauge Serial No. :91487
04/02/2026 2 18.9 117.1 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #22, Elv/Depth :1034
Comment : Gauge Serial No. :91487
04/02/2026 3 17.4 115.7 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #22, Elv/Depth :1036
Comment : Gauge Serial No. :91487
04/02/2026 4 18.4 116.5 2025-023 SP 103.5 18.9 95.1 95 D6938 Pass
Location : Lot #22, Elv/Depth :1036
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 2, 2026
Reviewer Name / DateKenneth Mosman, April 13, 2026