Density Test Report

Date :04/02/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :04/02/2026 14:00
Onsite Hours :04:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :04/02/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/02/2026 1 14 99.6 2025-033 SP 104.0 16.2 95.8 95 D6938 Pass
Location : Lot #41, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
04/02/2026 2 13.7 93.3 2025-033 SP 104.0 16.2 89.7 95 D6938 Fail
Location : Lot #41, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
04/02/2026 3 15.4 104.3 2025-033 SP 104.0 16.2 100.3 95 D6938 Pass
Location : Lot #41, Elv/Depth :4 feet below finished grade
Comment : Re-compacted with loaded truck and sheep-foot roller Gauge Serial No. :91487
04/02/2026 4 12.6 95.6 2025-033 SP 104.0 16.2 91.9 95 D6938 Fail
Location : Lot #42, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
04/02/2026 5 12.7 107.1 2025-033 SP 104.0 16.2 103.0 95 D6938 Pass
Location : Lot #42, Elv/Depth :4 feet below finished grade
Comment : Re-compacted with loaded truck and sheep-foot roller Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 2, 2026
Reviewer Name / DateKenneth Mosman, April 08, 2026