- Home
- Daily Field Report Report ID: 92317
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.
Our ASEC representative was on site to observe contractor (Lewis Contracting) and for the observation/testing of the placement of fill/backfill. The contractor continued placing soil lifts approximately 1 foot thick across the sewer line and compacted the lift using a vibrating sheep-foot roller. Density testing was performed, and the test results were provided to the contractor. The contractor is going to begin hauling more fill onto the site over the next few days and will call us back for final grade testing over the pipeline once they have completed the backfill installation.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.



