Skip to content

Daily Field Report

Date :04/03/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :04/03/2026 08:00
Onsite Hours :04:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :04/03/2026 12:00
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was on site to observe the grading contractor continue hauling blast rock and spreading it at Unit 4 Phase 3 at elevation 922.00.  These areas were suitably compacted for rockfill placement.

Observed the pipe contractor backfilling 36″CMP storm line between A6 and A7. Compacting efforts were observed by probing using a rounded end steel rod. The compacting efforts were suitable as per job requirements.

The writer also observed the drilling contractor continue drilling at the cul-de-sac for Unit 4 Phase 2.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Drilling atcul de sac

Mass rock at blast area

Placed blast rock at unit 4 phase 3

Hauling blast rock

Installing 36"cmp storm line between A6 and A7

Drilling

Drilling

Technician Signature / DateClyde Smith, April 3, 2026
Reviewer Name / DateKenneth Mosman, April 08, 2026