Skip to content

Density Test Report

Date :04/20/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :04/20/2026 08:00
Onsite Hours :03:30
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :04/20/2026 11:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/20/2026 1 15.4 96.4 2025-033 SP 104.0 16.2 92.7 98 D6938 Fail
Location : Sanitary sewer backfill between Z15 and Z16, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
04/20/2026 2 15.3 96.7 2025-033 SP 104.0 16.2 93.0 98 D6938 Fail
Location : Sanitary sewer line backfill between Z15 and Z16, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
04/20/2026 3 13.5 102.3 2025-035 SP 107.8 13.0 94.9 98 D6938 Fail
Location : Sanitary sewer line backfill between Z15 and Z16, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, April 20, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026