Density Test Report

Date :04/21/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :04/21/2026 09:30
Onsite Hours :03:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :04/21/2026 12:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/21/2026 1 18.4 94.1 Field proctor #6 98.0 17.2 96.0 95 D6938 Pass
Location : Backfill at sanitary sewer line between Z15 and Z16, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
04/21/2026 2 16.7 94.8 Field proctor #6 98.0 17.2 96.7 95 D6938 Pass
Location : , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
04/21/2026 3 18.9 94.3 Field proctor #6 98.0 17.2 96.2 95 D6938 Pass
Location : , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
04/21/2026 4 16.2 98.7 2025-031 SP 101.0 20.7 97.7 98 D6938 Fail
Location : Backfill at sanitary sewer line betwee Z15 and Z16, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :91643
04/21/2026 5 18.3 118.1 2025-031 SP 101.0 20.7 98.8 98 D6938 Pass
Location : , Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :91643
04/21/2026 6 18.5 100.7 2025-031 SP 101.0 20.7 99.7 98 D6938 Pass
Location : , Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, April 21, 2026