Date :04/24/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :04/24/2026 07:30
Onsite Hours :03:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :04/24/2026 10:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was onsite to observe the excavated subgrade for the east side radius roundabout (north side of the bridge). The subgrade soils were observed by probing using a rounded end steel rod and appeared stable which was suitable for base stone placement. The observation was also observed by Thompson Grading and a Paulding County official.

The writer assisted in observing concrete placement and testing at the north side bridge first wall pour.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Performing slump test during concrete pour at north side bridge wall pour

Observing form work prior to concrete pour

Observing subgrade at east side radius round about to bridge with Thompson Grading and Paulding Co. official using a rounded end steel rod.

Technician Signature / DateClyde Smith, April 24, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026