Density Test Report
Date :04/24/2026
Project No :2026C133
Client Company :Artisan
Arrival Time :04/24/2026 09:00
Onsite Hours :07:30
Name of the Project :Salacoa (AKA Boone Ford Rd) Robert's Dam
Project Location :Calhoun
Weather :Sunny
Departure Time :04/24/2026 16:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/24/2026 | 1 | 24.4 | 88.9 | 133-3 (field proctor) | 91.8 | 22.5 | 96.8 | 95 | D6938 | Pass |
| Location : | Fill placement at dam embankment toe of slope, Elv/Depth :697.70 | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 04/24/2026 | 2 | 25.2 | 89.8 | 133-3 (field proctor) | 91.8 | 22.5 | 97.8 | 95 | D6938 | Pass |
| Location : | fill placement at dam embankment toe of slope, Elv/Depth :693.86 | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 04/24/2026 | 3 | 23.3 | 89.9 | 133-3 (field proctor) | 91.8 | 22.5 | 97.9 | 95 | D6938 | Pass |
| Location : | Fill placement at dam embankment toe of slope, Elv/Depth :688.66 | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, April 24, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026