Density Test Report

Date :04/23/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :04/23/2026 10:00
Onsite Hours :03:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :04/23/2026 13:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/23/2026 1 10.3 100.5 2025-036 SP 107.0 18.5 93.9 95 D6938 Fail
Location : D-11, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
04/23/2026 2 14.3 102.0 2025-036 SP 107.0 18.5 95.3 95 D6938 Pass
Location : D-12, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
04/23/2026 3 12.6 101.8 2025-036 SP 107.0 18.5 95.1 95 D6938 Pass
Location : D-13, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
04/23/2026 4 11.0 101.8 2025-036 SP 107.0 18.5 95.1 95 D6938 Pass
Location : lot 38, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
04/23/2026 5 11.0 101.8 2025-036 SP 107.0 18.5 95.1 95 D6938 Pass
Location : lot 39, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, April 23, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026