Skip to content

Daily Field Report

Date :05/01/2026
Project No :2026C133
Client Company :Artisan
Arrival Time :04/24/2026 08:00
Onsite Hours :05:00
Name of the Project :Salacoa (AKA Boone Ford Rd) Robert's Dam
Project Location :Calhoun
Weather :cloudy
Departure Time :04/24/2026 13:00
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was on site to observe fill placement for the toe of the dam. Another representative from ASEC will begin observing fill placement and performing density testing. Our representative observed the third section of the french drain installed at the west end of the dam. The drain had approximately 18″ of No. 57 stone wrapped in filter fabric with 6″of No. 57 stone placed over top of the filter fabric. The grading contractor continued placing fill at the toe of the slope embankment dam. Density tests will be performed by the other ASEC representative.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Added french drain at west end of slope

Showing area for borrowed excavated fill materials

Placing fill at toe of slope

Pushing fill over french drain

Technician Signature / DateClyde Smith, May 1, 2026
Reviewer Name / DateKenneth Mosman, May 05, 2026