- Home
- Density Test Report Report ID: 93874
- Edit Download Report
Density Test Report
Date :04/30/2026
Project No :2025C260
Client Company :Artisan
Arrival Time :04/30/2026 08:00
Onsite Hours :07:00
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :sunny
Departure Time :04/30/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/30/2026 | 1 | 14.3 | 121.2 | 2025-035 SP | 107.8 | 13.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Between Manhole B7 and B9, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 04/30/2026 | 2 | 15.7 | 122.8 | 2025-035 SP | 107.8 | 13.0 | 98.4 | 98 | D6938 | Pass |
| Location : | Between Manhole B7 and B9, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, April 30, 2026
Reviewer Name / DateKenneth Mosman, May 11, 2026
