Skip to content

Density Test Report

Date :05/04/2026
Project No :2026C133
Client Company :Artisan
Arrival Time :05/04/2026 08:00
Onsite Hours :9:30
Name of the Project :Salacoa (AKA Boone Ford Rd) Robert's Dam
Project Location :Calhoun
Weather :sunny
Departure Time :05/04/2026 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/04/2026 1 13.1 105.5 133-6 (field proctor) 107.8 17.1 97.9 95 D6938 Pass
Location : Along the slope, Elv/Depth :690.1
Comment : Gauge Serial No. :38069
05/04/2026 2 15.2 103.0 133-6 (field proctor) 107.8 17.1 95.5 95 D6938 Pass
Location : Along slope, Elv/Depth :691.22
Comment : Gauge Serial No. :38069
05/04/2026 3 16.2 103.8 133-6 (field proctor) 107.8 17.1 96.3 95 D6938 Pass
Location : Along dam, Elv/Depth :690.8
Comment : Gauge Serial No. :38069
05/04/2026 4 18.5 103.6 133-6 (field proctor) 107.8 17.1 96.1 95 D6938 Pass
Location : Along dam, Elv/Depth :691.9
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, May 4, 2026
Reviewer Name / DateKenneth Mosman, May 11, 2026