Skip to content

Density Test Report

Date :04/23/2026
Project No :2023C159
Client Company :CW Matthews
Arrival Time :04/23/2026
Onsite Hours :
Name of the Project :Airfield Repairs 2021-23
Project Location :HJAIA, Atlanta, GA
Weather :overcast
Departure Time :04/23/2026
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/23/2026 1 8.3 108.8 2026-111 119.3 10.6 91.2 90 D6938 Pass
Location : Area 2, Elv/Depth :subgrade top lift
Comment : Pass / QA in agreement Gauge Serial No. :38069
04/23/2026 2 7.6 117.9 2026-111 119.3 10.6 98.8 90 D6938 Pass
Location : area 2, Elv/Depth :subgrade top lift (before topsoil)
Comment : Pass / QA in agreement. Gauge Serial No. :38069
Technician Signature / DateRussell Hendrix, April 23, 2026