- Home
- Density Test Report Report ID: 94400
- Edit Download Report
Density Test Report
Date :05/15/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :05/15/2026 09:00
Onsite Hours :06:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :05/15/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/15/2026 | 1 | 20.2 | 94.1 | 2025-032 SP | 94.9 | 25.0 | 99.2 | 98 | D6938 | Pass |
| Location : | Road section, Elv/Depth :final grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 05/15/2026 | 2 | 21.1 | 89.2 | 2025-032 SP | 94.9 | 25.0 | 94.0 | 98 | D6938 | Fail |
| Location : | Road section, Elv/Depth :final grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, May 15, 2026
