Density Test Report

Date :05/15/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :05/15/2026 09:00
Onsite Hours :06:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :05/15/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/15/2026 1 20.2 94.1 2025-032 SP 94.9 25.0 99.2 98 D6938 Pass
Location : Road section, Elv/Depth :final grade
Comment : Gauge Serial No. :38069
05/15/2026 2 21.1 89.2 2025-032 SP 94.9 25.0 94.0 98 D6938 Fail
Location : Road section, Elv/Depth :final grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, May 15, 2026