Skip to content

Density Test Report

Date :05/15/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/15/2026 07:30
Onsite Hours :05:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :05/15/2026 12:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/15/2026 1 20.6 103.5 2026-136 113.0 14.0 91.6 95 D6938 Fail
Location : Backfill at northside bridge abutment, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
05/15/2026 2 22.0 101.0 2026-136 113.0 14.0 89.4 95 D6938 Fail
Location : Backfill at northside bridge abutment, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
05/15/2026 3 21.7 102.8 2026-136 113.0 14.0 91.0 95 D6938 Fail
Location : Backfill at north side bridge abutment, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, May 15, 2026