Skip to content

Density Test Report

Date :05/18/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/18/2026 07:30
Onsite Hours :9:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :05/18/2026 16:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/18/2026 1 19.2 128.4 2026-136 113.0 14.0 95.3 95 D6938 Pass
Location : Retests, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
05/18/2026 2 19.4 108.3 2026-136 113.0 14.0 95.8 95 D6938 Pass
Location : Retest, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
05/18/2026 3 18.5 107.0 2026-136 113.0 14.0 94.7 95 D6938 Fail
Location : Retest, Elv/Depth :+2'
Comment : Gauge Serial No. :91643
05/18/2026 21.3 92.8 2025-032 SP 94.9 25.0 97.8 95 D6938 Pass
Location : Backfill at north side bridge abutment, Elv/Depth :+4'
Comment : Gauge Serial No. :91643
05/18/2026 2 23.7 91.8 2025-032 SP 94.9 25.0 96.7 95 D6938 Pass
Location : , Elv/Depth :
Comment : Gauge Serial No. :
05/18/2026 3 22.4 93.1 2025-032 SP 94.9 25.0 98.1 95 D6938 Pass
Location : Backfill at north side bridge abutment, Elv/Depth :+4'
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, May 18, 2026