- Concrete Test Report Report ID: 94492
- Edit Download Report
Concrete Test Report
Date :05/14/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/14/2026 4:30
Onsite Hours :00:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Clear and sunny
Departure Time :05/14/2026 4:30
ASEC Technician Name :Narayana Ganesh Undavalli
Concrete Placement Information
Location(S):
N/A
Testing:
8 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 8 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 8 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Test 1 - 5:25 AM ,9yds
Amb Temp - 57
Concrete Temp - 65
Air - 1.3
Slump - 5.5
Unit wt of concrete - 144.6.
Test 2 - 6:00 AM Amb Temp, 45 yds
Amb temp - 58
Concrete Temp - 65
Air - 1.2
Slump - 5
Unit wt - 145.6.
Test 3 - 6:45 AM Amb Temp, 90 yds
Amb temp - 57
Concrete temp - 65
Air - 1.5
Slump - 5
Unit wt - 145.
Test 4 - 7:55 AM,
Amb temp - 57
Concrete temp - 65
Air - 1.2
Slump - 7
Unit wt - 145.8
Test 5 - 9:15 AM
Amb temp - 60
Concrete temp - 65
Slump - 3.5
Air - 1.3
Unit wt - 147
Test 6 - 10:35 AM,
Amb temp - 63
Concrete temp - 68
Slump - 5.5
Air - 1.2
Unit wt - 149.
Test 7 - 11:28 AM
Amb temp - 66
Concrete temp - 68
Slump - 5.5
Air - 1.3
Unit wt - 147.
Test 8 - 2:26 PM
Amb temp - 71
Concrete temp - 65
Slump - 5
Air - 1.3
Unit wt - 145.
Technician Signature / DateNarayana Ganesh Undavalli, May 14, 2026
Reviewer Name / DateKenneth Mosman, May 26, 2026